| Date |
Description |
Client |
| MAY.-SEP.'91 |
Electrical
work and installation on bldg. #100 (customs),
#200 (inspection module) #300 ( rayl way platform-import
lot ), #400 ( import module ) y #600 (federal
roads & bridges), at solidarity international
bridge in Colombia Nuevo León. |
SADECA
CONSTRUCTORA/
FIDENOR
|
| JUL.-SEP.'91 |
Supply
of materials and installation of fire equipment
pipes at Finsa III plant industrial park in
Nuevo Laredo, Tamps. |
|
| AUG.
'91-JUN'93 |
Electrical
preventive and corrective ( minor ) maintenance. |
|
| SEP.'91-FEB.'92
|
Preventive
& corrective maint. ( minor ) on bldgs.
At solidarity int’l bridge in Colombia,
N.L. |
FIDENOR |
| JUN.'92-SEP.'93
|
Electrical
installations for operations 10, 20, 30, line
a and line b upper, including:
- Reconstruction of electricals panels.
- Assembly & wiring of elect. Panels.
- Instalation, connection of panels and machines.
- Trunk feeder.
|
C
M I |
| JUL.-OCT.
'92
|
Electrical
installations at tecmosa plant located at rio
bravo ind. Park in Nuevo Laredo, Tamps. With
an area of 30,800 sq. Ft. |
RIO
SAN JUAN |
| OCT.'92-MAR.'93
|
Electrical
installation for 3.il project, operations 10,
20, 30, line a and line b lower, including:
- Reconstruction of elect. Panels
- Pre-wiring for 112 stations
- Assembly and wiring of panels
- Instalation and connection of panel and machines.
- Trunk feeders.
|
C
M I |
| NOV.'92-JAN.'93
|
Supply
and installation of ground systems in aisles
5, 6, 7, 8 & 9 of the Finsa ecological park
in Ixtapalapa, México, D.F. |
FINSA |
| DEC.'92-MAR.'93
|
Electrical
supply and installation of the v.i.p. lounge
at the Maclovio Herrera bus terminal located
at Jose Refugio Romo and Agustin Melgar street
in Nuevo Laredo, Tamps., with an area of 18000
sq.ft. |
FINSA |
| JAN.'93-FEB.'93
|
Electrical
installation for 2.ol zeta exhuast op.10 and
op.20, including:
- Reconstruction of elect. Panels.
- Prewiring for 15 stations.
- Assembly and wiring of panels.
- Instalation panel & machine connections.
- Trunk feeders.
|
C
M I
|
| FEB.-MAR.'93
|
Electrical
installation of loctite machines in 3.il lower,
including:
- Prewiring of stations.
- Assembly and wiring of panels
- Installation, connection of panels anc machines.
- Trunk feeders.
|
C
M I |
| MAR.-JUN.'93
|
Electrical
installation in plants Finsa VI and Finsa VII
located at the Finsa ecologal park in Ixtapalapa
México, D.F. |
FINSA |
| APR.
-JUN. '93 .
|
Electrical
supply and installation at the lux operating
plant located in the Río Grande industrial
park in Nuevo Laredo, Tamps. |
LUX
OPERATING |
| AUG.
1993
|
Electrical
installations in rectificator machine hill-acme
of the cmi tool- room, including:
- Panel and machine rehabilitation.
- Assembly and wiring components.
- Trunk feeders
|
C
M I |
| AUG.
1993
|
Electrical installation to 2.ol chrysler exhaust
line op.#10, 20 and 30. |
C
M I |
| SEP.
1993 |
Supply
and instalation of condenser banks with a capacity
of 200 kvar. In alambrados automotrices plants. |
ALAMBRADOS
AUTOMOTRICES |
| SEP.
1993
|
Supply
and instalation of condenser banks in plants:
- ECCSA III with 210 kvar
- ECCSA V with 150 kvar
- ECCSA VI with 90 kvar
|
ENSAMBLE
DE CABLES Y COMPONENTES |
| SEP.
- NOV. ‘93
|
Grund
system in nave “Comercial Mexicana”
located in ecologic park Finsa in Ixtapalapa,
México, D.F. |
FINSA |
| OCT.-'93
DEC.'94
|
Electrical
installation to 5.2l Chrysler line op.#50, 60
and 70, including:
- Electric panels reconstruction
- Stations prewiring
- Assambly and wiring panels
- Installations and connection of panels and
machines.
- Trunk feeders.
|
C
M I |
| SEP.'93-JAN.'94
|
Electromechanics
installations in “Radiator Sopport Line”
in Lamosa plant, including:
- Operation #10 relocation
- Operation #15,25,33,70 & 120 instalation
- Quit disconect instalation, op.# 40, 45, 80
& 160.
|
MURALLA |